Home > Cases > Content
Installation technology process of cover rubber and intermediate rubber
Mar 28, 2018

Installation technology process of cover rubber and intermediate rubber.


A: Preparatory work

1. Choose a suitable location ( Good ventilation ), then unfold each roll of material.

2. Checking the valucanization equipment and tools, ensure all parts are available


B: Onsite joint separate processing and adhesive

1. Stepwise handling of the conveyor belts, then polishing the belt with angle grinder and grinding disc. 

2. Cleaning the polish surface, then painting hot valucanized glue to the polished part. 

3. The joint after painted covered the un-vulcanized cover rubber and intermediate rubber

4. Increasing the heat and pressure of the conveyor belt joint by vulcanized equipment ( Keep  the constant temperature 40-45 minutes when tempreature up to 145 C ) , then stop increase temperature.

5. Remove vulcanization equipment when a low temperature of equipments.


04.jpg